Oil&Gas/Chemistry |
Daesan Plant Demineralization System Expansion |
1996 |
5,568 |
Ion Exchange |
EPC |
Oil&Gas/Chemistry |
Onsan p-Xylene Plant Demineralization System |
1996 |
4,800 |
Ion Exchange |
EPC |
Microelectronics |
Electronics Water Treatment Facilities of Anam Industrial Co., Ltd. |
1995 |
2,500 |
Physical+Chemical |
EPC |
Microelectronics |
Silicon Wafer Water Treatment Facilities of POSCO HULS |
1995 |
1,920 |
Physical+Chemical |
EPC |
Other Industry |
Samsung Electronics Suwon (Extension) |
1995 |
8.9km |
Vacuum Transfer System |
EP |
Oil&Gas/Chemistry |
Onsan Plant Demineralization System Expansion |
1995 |
8,160 |
Ion Exchange |
EPC |
Oil&Gas/Chemistry |
Daesan Plant Demineralization System Expansion |
1994 |
7,920 |
Ion Exchange |
EPC |
Power |
Hadong #1,2,3,4 Thermal Power Plant Chemical Injection System (500 MW x 4) |
1994 |
2,640 |
Physical-Chemical |
EPC |
Microelectronics |
Electronics Semiconductor Wastewater Treatment Facilities of Hyundai Electronics Industries Co., Ltd. |
1994 |
1,500 |
Physical+Chemical |
EPC |
Other Industry |
Samsung Electronics Suwon |
1994 |
2.4km |
Vacuum Transfer System |
EP |