Industry |
Name of Project |
Date |
Capacity (m³/day) |
Process |
Work Scope |
Power |
Incheon/Nonhyun Waste & Water Treatment System |
2003 |
18 |
Physical / Chemical |
EP/SV |
Power |
Yonghung #1,2 Thermal Power Plant FGD WWT |
2003 |
768 |
Physical/ Chemical |
EPC |
Power |
Samcheonpo #1~4 Thermal Power Plant FGD WWT |
2003 |
1,248 |
Physical/ Chemical/Boilogical |
EPC |
Municipal |
Kunjang Wastewater Final Treatment CSBR Facilities |
2003 |
30,000 |
CSBR |
EPC |
Oil&Gas/Chemistry |
Susan Oil Stock Plant Wastewater Treatment |
2003 |
840 |
Physical-Chemical |
EPC |
Oil&Gas/Chemistry |
LG Chemical 2AA Phosphorus Removal Facility |
2003 |
336 |
Physical-Chemical |
EPC |
Oil&Gas/Chemistry |
CPI Package Manufacture & Installation |
2003 |
2,000 |
Physical-Chemical |
EPC |
Iron/Steel |
FINEX Cooling Screw Facility |
2003 |
1,080 |
Cooling Water System |
EP/SV |
Iron/Steel |
Pohang Hot Rolling Steel Fast Wastewater Treatment |
2003 |
320 |
Physical / Chemical |
EPC |
Oil&Gas/Chemistry |
BASF KOREA Yosu TDI Incinerator Wastewater Treatment Facilities Manufacture & Installation |
2002 |
1,938 |
Physical-Chemical |
EPC |