| 사업분야 |
프로젝트명 |
완료일 |
국가 |
용량 (m³/day) |
프로세스 |
작업구분 |
| Power |
Vietnam Nghi Son 2 FGD WWT |
2021 |
all |
18 m3/hr |
Physical-Chemical, Biological |
EP/SV |
| Oil&Gas / Refinery |
UAE ADNOC Refining CFP WTP |
2021 |
UAE |
12,000/14,880 |
1st ACF / 2nd ACF MBP / MBP |
EP/SV |
| Power |
Vietnam Song Hou 1 Power Plant, FGD Wastewater Treatment Facilities |
2021 |
all |
23 m3/hr |
Chemical Coagulation-Flocculation, MMF, ACF, and Biological Treatment |
EP/SV |
| Power |
Vietnam Nghi Son 2 FGD WWT |
2021 |
all |
18 m3/hr |
Physical-Chemical, Biological |
EP/SV |
| Oil&Gas / Refinery |
Iraq Karbala Raw Water Treatment Package |
2020 |
all |
46,800 / 14,352 |
Clarifier / MMF / Sludge Disposal / UF / 2Pass RO / MBP |
EP/SV |
| Oil&Gas / Refinery |
Iraq Karbala River Water |
2020 |
all |
28,870 / 456 |
Coarse Strainer / Hydrocyclons / Thickener / Filterpress / Sludge Silo |
EP/SV |
| Power |
Vietnam Song Hau 1 Power Plant, Water Treatment Plant |
2019 |
all |
1,440 |
ACF UFROMBP |
EP/SV |
| Power |
송하우1 화력발전소 프로젝트 탈황폐수처리설비 |
2016 |
Vietnam |
552 |
Physical/ Chemical/Boilogical |
EP |
| Power |
송하우1 화력발전소 프로젝트 수처리설비 |
2016 |
Vietnam |
1,584 |
UF+RO+MBP |
EP |
| Oil&Gas/Chemistry |
알제리/Timimoun Field Development Project(Produced Water) |
2016 |
Algeria |
120 |
CPI+IGF+Bio Treatment |
EP/SV |