Industry Name of Project Date Capacity (m³/day) Process Work Scope
Power Boryeong #7~8 Thermal Power Plant FGD W.W.T (560MW x 2) 2005 1,200 Physical-Chemical EPC
Power Tangjin #1~4 Thermal Power Plant T-N Removal System (W.W.T) 2005 960 Physical-Chemical EPC
Power Hadong #1~6 Thermal Power Plant T-N Removal System (W.W.T) 2005 1,080 Physical-Chemical EPC
Other Industry POSCO 2nd 2005 3.6km Vacuum Transfer System EP
Iron/Steel Pohang 2 Continuous Hot Rolling Plant (Fast Cooling Water) 2005 525 Cooling Water System, Chemical Dosing System, Conventional EP/SV
Iron/Steel Pohang 2 COKE CDQ Demineralization System 2005 55 2B3T + MBP EP/SV
Iron/Steel Finex 1.5MT Wastewater Treatment Package 2005 10,000 Clarifier, Mechanical Filter, Classifier, Degasser, Chemical Dosing System EP/SV
Iron/Steel Kwangyang Hot Rolling Steel Fast Cooling Water Treatment Facilities 2005 5,000 Cooling Water System, Chemical Dosing System, Conventional EP/SV
Iron/Steel No.3 Wire Rod Mill Plant Dewatering Facility 2005 2,900 Physical/Chemical + Dewatering Facility EPC
Iron/Steel Mg Sc Type-caster Cooling Water System 2005 57 Cooling Water System EPC