Reference -
Domestic Experiences

주요실적국내실적

사업분야
시스템
사업분야 프로젝트명 완료일 시스템 용량 (m³/hr) Q'ty
Power Plant Seoinchon #3, 4 Thermal Power Plant (900 MW x 2) 1996 Stop Gate 3
Power Plant Seoinchon #3, 4 Thermal Power Plant (900 MW x 2) 1996 Stop Gate 2
Power Plant Taeahn #3, 4 Thermal Power Plant (500 MW x 2) 1996 Stop Gate 4
Power Plant Uljin #3, 4 Nuclear Power Plant (1,000 MW x 2) 1995 Travelling Water Screen 32,475 6
Power Plant Uljin #3, 4 Nuclear Power Plant (1,000 MW x 2) 1995 Travelling Water Screen 32,475 6
Power Plant Wolsung Nuclear Power Plant (700 MW x 3) 1995 Travelling Water Screen 31,212 10
Power Plant Wolsung #2, 3, 4 Nuclear Power Plant (700 MW x 3) 1995 Travelling Water Screen 31,212 10
Power Plant Taeahn #3, 4 Thermal Power Plant (500 MW x 2) 1995 Travelling Water Screen 46,880 2
Power Plant Hadong #1, 2 Thermal Power Plant (500 MW x 2) 1995 Travelling Water Screen 23,440 8
Power Plant Kori #1 Nuclear Power Plant (500 MW) 1995 Travelling Water Screen 32,160 3

(02799) 서울시 성북구 화랑로 76 코업스타클래스 2층     TEL 02-910-2500     FAX 02-910-1953     coway.entech@coway.co.kr
COPYRIGHT (C) COWAY ENTECH. ALL RIGHTS RESERVED.